Skip to main content


PISTOIA-LUPICCIANO-SANTOMORO

27-28

Winter timetable (from 15/09)

Download line timetable and map

#at_Pistoia from 07:30 on 28th April until the end of the roadworks in Piazza San Francesco d' Assisi, the lines will be diverted. For details of the diversions click on

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map