Skip to main content


PISTOIA-Z.INDUSTRIALE-CHIESINA MONTALESE

35

Summer timetable (from 11/06)

Download line timetable and map

35

#at_Pistoia from 15th July, the terminus section of line 35 is closed to traffic. The line will have to make the following route change:

Line "35" runs with terminus at Chiesina Montalese
Regular route up to Via di Cafaggio (old terminus); continue straight to Via Montalese; Via Montalese, Villa or Fattoria di Celle; then re-enter Via Montalese, Via di Cafaggio and finally resume the regular route.

Stops along the diversion route must be made.

Back to top

Interactive map

Summer timetable (from 11/06)

Download line timetable and map