Skip to main content


CASTELFIORENTINO-MONTAIONE

80

Winter timetable (from 15/09)

Download line timetable and map

33 80

#at_Empoli

🚧 In order to allow the first phase of the roadworks for the bridge reconstruction, with immediate effect and until further notice, the intersection between Strada Provinciale 26 and Via Ruggero Grieco in the locality of Case Nuove in the municipality of Gambassi Terme (FI) will be closed to traffic. Therefore, the lines will undergo the following temporary diversions of route 🔄

LINE 33 direction CASTELFIORENTINO coming from Montaione (direct)
From SP 26, services diverted onto Via dei Profeti (provisional road), Via dei Profeti from where the usual itinerary will be resumed at the intersection with Via R. Grieco. Consequently, the stop in the locality of Case Nuove, located on Via R. Grieco, will be temporarily suspended.

LINE 80 direction CASTELFIORENTINO
From SP 26, services diverted onto Via dei Profeti (provisional road), Via dei Profeti, Via N. Machiavelli, SP 4 Volterrana from where the usual itinerary will be resumed. Consequently, the stop in the locality of Case Nuove, located on SP 26, will be temporarily suspended.

#at_Empoli

From Thursday 17th April to Tuesday 22nd April 2025 inclusive, the service will operate as scheduled for school holiday days. Therefore, the routes and services with school frequency will not be carried out.

The service will be completely suspended on Sunday 20th April 2025 (Santa Pasqua) and Thursday 1st May 2025 (1° maggio Festa Dei Lavoratori).

On Monday 21st April 2025 (Pasquetta) and Friday 25th April 2025 (25 aprile Festa Della Liberazione), the service will operate as normally scheduled for holiday days.

Additionally, on Saturday 26th April 2025, the service will operate as scheduled for school holiday days. Therefore, the routes and services with school frequency will not be carried out.

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map