Skip to main content


Bagno a Ripoli - Grassina

24

Winter timetable (from 15/09)

Download line timetable and map

24 85 32

#at_Firenze

For the redevelopment of the new road layout near the Santa Maria Annunziata Hospital on Via dell’Antella, roadworks are starting on 18th May with an expected duration of 3 and a half months. This includes the use of the remaining road in front of the hospital in both directions and the use of the new road between the car park and the A1 Motorway.

The OSPEDALE ANNUNZIATA stop (towards Antella) remains in its current position, while the OSMA PARCHEGGIO stop (towards Ponte a Niccheri, parking side) is discontinued and replaced by a temporary stop on the hospital side, just before the OSPEDALE ANNUNZIATA stop.

Bus lines 32, 24, and 85 will follow a change in route according to the attached diversion plan.

Back to top

Interactive map

Winter timetable (from 15/09)

Download line timetable and map